


BC2 Greenhouse, CSU Wagga Wagga NSW
Charles Sturt University installed a new BC2 greenhouse and enlisted KCP to design the mechanical systems. KCP designed the air-conditioning system for 4 plant cambers and the Anteroom along with air-conditioning, shading, misting, BMS controller and operation. The DAWR requirements for a Bio containment BC2 facility were integral to the design.